An Outstanding Pilot Milling Performance in Brunei Results in >$2M in Cost Savings
A step change in total meterage milled and a ROP improvement of 182% compared to offset data was achieved. The operational rig time was reduced by 9½ days. Results: • A successful milling operation with no non-productive time (NPT). • An improvement of 182% in overall ROP. • A rig time reduction of 9 ½ … Read more