Case Studies

TrackMaster Select* Enables First 20 inch Low-Side Sidetrack in Gulf of Mexico

Wellbore Integrity Solutions’ (WIS) teams successfully deployed the TrackMaster Select System to sidetrack from 20-inch, 133 lb/ft K-55 casing, enabling recovery of the 17.5-inch hole section. Collaborative Planning Enables Successful 20-Inch Sidetrack for Major Operator in Mexico Results: *Mark of Wellbore Integrity Solutions.

6000 ProMILL Duo™ Enables Abandonment Operations Below a 7 inch Scab Liner in the UAE

Wellbore Integrity Solutions (WIS) provided an innovative solution to mill a 95/8 inch window, using tools capable of drifting a 7 inch scab liner above desired window depth. Milling a single casing window below a scab liner, using dual casing milling technology for the first time. Results: *Mark of Wellbore Integrity Solutions.