Careful planning and detailed risk analysis led to the successful retrieval of a Seal Bore Quantum
Packer along with a 159-ft gravel pack completion in a single run at a remote location
Precise torque and drag simulations were essential to delivering this exceptional operation, which was awarded to Wellbore Integrity Solutions (WIS) for its proven expertise in retrieving Quantum Packer Seal Bore systems. The team faced the challenge of removing both the packer and the 159‑ft gravel pack completion in a single run, and strong collaboration between companies helped pinpoint the weakest component and establish safe operating limits based on simulation results. Runner modeling provided accurate guidance on pulling force, impact force, and weight transfer—indicating the need for a controlled 24‑klb pull to deactivate the seal bore mechanism and 34 klbs to lift the gravel pack assembly. This thorough planning enabled a highly efficient retrieval, eliminating additional BHAs, milling, or fishing operations and delivering significant cost savings through reduced trips and flawless execution.
Download Case Study