Planning and Experience in Geothermal Operations in Indonesia Ensures Success
Two different operational examples highlight specific procedural requirements in geothermal applications.
Results
Example 1
- The liner was successfully cut and retrieved while under total fluid losses.
- The customer continued to drill an open hole sidetrack and reach the desired reservoir target.
Example 2
- The cased hole sidetrack into a high compressive strength formation was delivered in one trip using the TrackMaster Select System.
- The well was successfully concluded.
Download the Bulletin for more details
*Mark of Wellbore Integrity Solutions.