The Wellbore Integrity Solutions (WIS) operations team successfully collaborated to fish out the 5-5/8 inch OD drilling BHA that fell due to a twist-off failure in the 3-1/2 inch drill pipe.
Carefully Planned Fishing Operation Reduces Cost and Saves Time
Results:
• Successfully latch on the fish and retrieved the 4000 m of drill pipe and drilling BHA in a single run, exceeding customer expectations.
• 100% of fish retrieved as planned.
• Longest Fish retrieval in Mexico operations.
*Mark of Wellbore Integrity Solutions.