An Outstanding Open Hole, Horizontal Washover and Fishing Operation, Under Total Losses, Results in the Recovery of an RSS BHA.
The WIS team in Kuwait successfully planned and recovered a BHA valued at $2 million and avoided a sidetrack requirement.
Result
- A successful washover of the stuck BHA in the horizontal section was completed, under a condition of total fluid losses.
- The stuck BHA was retrieved at the first attempt using the TMC Impact System, in an open hole while the well was under total losses.
- The customer saved 2 million dollars in potential Lost-In-Hole (LIH) charges.
- The customer avoided significant sidetrack costs that would have
been incurred.
Download the Bulletin for more details
*Mark of Wellbore Integrity Solutions.