Newsroom

Wellbore Integrity Solutions Announces the Opening of Wellbore Integrity Solutions Saudi Arabia Ltd. in Dammam, Saudi Arabia

HOUSTON – March 9, 2021 – Wellbore Integrity Solutions (WIS) today announced the opening of our office in Dammam, Saudi Arabia. By transitioning over operations in Saudi Arabia resulting from the acquisition announcement made in January 2020, Wellbore Integrity Solutions is solidifying our presence in the Kingdom. Saudi Arabia plays an important role as a

Read More »

ProMill Duo* Application Sets Record of a 111 ft window in Qatar

ProMill Duo* Application Sets Record of a 111 ft window in Qatar. Barrier restoration across 7 inch and 9⅝ inch casings achieved successfully. Results An estimated saving of 40 days was accomplished. A long interval of 7-inch casing milling was eliminated using the ProMILL Duo technology The window length of 111 ft was a record

Read More »

A Successful Section Milling and Hole Enlargement Operation in Colombia

A Successful Section Milling and Hole Enlargement Operation in Colombia An efficient abandonment operation in 7-inch casing was completed using a K-Mill and Underreamer in two days. Results Successfully completed section milling operation in 7-inch casing, including the casing collar. Successfully enlarged the wellbore to 16-inch diameter. The operation was completed within two days. The

Read More »

Wellbore Integrity Solutions and Reactive Downhole Tools Announces Exclusive Licensing Agreement for the CHIMERA Product Line of Wellbore Cleanout Tools

    HOUSTON – December 4, 2020 – Wellbore Integrity Solutions (WIS) and Reactive Downhole tools (RDT) jointly announce an exclusive global licensing agreement for the Reactive CHIMERA suite of Wellbore Cleanout tools. “The CHIMERA portfolio is a great addition to the core business of WIS and the outstanding reputation the Reactive name has within

Read More »