Spotlight on Ecuador —
Operational Performance and Reliability.
14 consecutive cased hole sidetracks completed flawlessly with the TrackMaster Select* system and experienced local Wellbore Integrity Solutions (WIS) personnel.
Results:
- 14 consecutive flawless cased hole sidetracks in a single trip
- Six different customers
- Seven planned jobs and seven unplanned jobs
- Included wells with poor cement conditions at the exit point
- Zero hours NPT / Zero Accidents / Zero Near Misses
- Average milling time of 5.5 hours
*Mark of Wellbore Integrity Solutions.