Wellbore Integrity Solutions, Mexico in cooperation with the client successfully deployed its first TrackMaster Whipstock system in Latin America.
The system was set in a 13 3⁄8 inch casing #72 TAC – 110 casing at 2,373 meters on the Ixachi – 11 well. Milling time was a record of 6.78 meters in 10.19 hours and a Rat Hole record of 7 meters in 5.13 hours. The BHA with a PDM was passed through the window with no problems.
Result
- Successful 1-trip sidetrack achieved
- 12 1⁄4 inch hole recovered to reach planned total depth