Critical Cased Hole Fishing in EcuadoRecovers 2300 ft Wire and Electrical Submersible Pump (ESP) BHA

Wellbore Integrity Solutions’ (WIS) team recovers 4-inch OD artificial lift BHA left in hole after workover deviation.

Unplanned fishing operation achieves full recovery, avoiding well abandonment.

Results:

• Successful latch on the ESP BHA in a single run, after retrieving 2300 ft of electrical wire, exceeding customer expectations.
• 100% of fish retrieved as planned.
• The variety and high quality of tools allowed a flawless job execution.

*Mark of Wellbore Integrity Solutions.