An Outstanding, High DLS, Cased Hole Exit Success in West Texas

Wellbore Integrity Solutions (WIS) successfully set a 9 5/8 inch TrackMaster Select* system for UpCurve Energy, in a high DLS wellbore, saving 600 feet or 75% of the previously drilled curve section.

Results:

  • The system was conveyed successfully through a DLS of greater than 10 deg/100 ft.
  • The system was set successfully in the curve at, 9,692 ft depth with an inclination of 46 deg and a 6.74 deg /100 ft DLS at the setting depth.
  • The window was milled and the rathole drilled in a single trip, in 12 hours.
  • UpCurve Energy successfully drilled and landed the curve and continued to drill the wellbore to the desired target depth.

*Mark of Wellbore Integrity Solutions.