Continued Sidetracking Success in Geothermal Operations Using the TrackMaster* Select System.

The TrackMaster Select, configured for Geothermal Operations, successfully completed a 13 3/8 casing exit in a single trip. After the conclusion of drilling operations, the system was retrieved to enable multilateral production.

A system ideally suited to Geothermal Operations.

Results:

- Successful 1-trip sidetrack.
- System operation not impacted by fluid loss environment.
- A 21-foot rathole was drilled in a high UCS formation.
- The tri-mill had acceptable wear, confirming a full gauge casing exit.
- The subsequent 12 1/4 inch drilling BHA passed freely through the window.
- System successfully retrieved with standard retrieval hook.

*Mark of Wellbore Integrity Solutions.