The TrackMaster Select, configured for Geothermal Operations, successfully completed a 13 3/8 casing exit in a single trip. After the conclusion of drilling operations, the system was retrieved to enable multilateral production.
A system ideally suited to Geothermal Operations.
Results:
- Successful 1-trip sidetrack. - System operation not impacted by fluid loss environment. - A 21-foot rathole was drilled in a high UCS formation. - The tri-mill had acceptable wear, confirming a full gauge casing exit. - The subsequent 12 1/4 inch drilling BHA passed freely through the window. - System successfully retrieved with standard retrieval hook.
*Mark of Wellbore Integrity Solutions.