Wellbore Integrity Solutions was called upon to plan, mobilize, and successfully install a high-pressure casing patch during a work-over operation.

Result

  • A rapid response was provided to restore integrity to leaking 9 5⁄8 in. casing, allowing work-over operations to continue.
  • 9 5⁄8in. casing cutting, recovery, and stump preparation were conducted efficiently and in accordance with plans.
  • The high-pressure casing patch was installed and successfully tested.
  • This casing repair operation resulted in maintaining the life and integrity of the well.