An Outstanding Open Hole Sidetracking Performance in the Permian Basin using the TrackMaster* OH System

An Outstanding Open Hole Sidetracking Performance in the Permian Basin using the TrackMaster OH System

After two unsuccessful sidetrack attempts, a customer in the Permian Basin mobilized WIS to set a 103/4 inch TrackMaster OH whipstock and drill the rathole. The operation was completed in one trip in a total of 16 hours.

Results

  • Sidetracking success in one trip in challenging total fluid losses zone.
  • The sidetrack was completed in 16 hours, surface to surface.
  • The sidetracking time included 23 feet of 97/8 inch rathole.
  • The TrackMaster system was set just above the fish, maximizing wellbore recovery.

Download the Bulletin for more details

*Mark of Wellbore Integrity Solutions.