An Outstanding Open Hole Sidetracking Performance in the Permian Basin using the TrackMaster OH System
After two unsuccessful sidetrack attempts, a customer in the Permian Basin mobilized WIS to set a 10 3/4 inch TrackMaster OH whipstock and drill the rathole. The operation was completed in one trip in a total of 16 hours.
Results
- Sidetracking success in one trip in challenging total fluid losses zone.
- The sidetrack was completed in 16 hours, surface to surface.
- The sidetracking time included 23 feet of 9 7/8 inch rathole.
- The TrackMaster system was set just above the fish, maximizing wellbore recovery.
Download the Bulletin for more details
*Mark of Wellbore Integrity Solutions.