Deployment of TrackMaster-OH Whipstock Recovers 8,300 ft of Horizontal Wellbore in the Permian Basin

Deployment of TrackMaster*-OH Whipstock Recovers 8,300 ft of Horizontal Wellbore in the Permian Basin.

WIS successfully set an open hole whipstock 8,350 ft into a 6 3⁄4 inch lateral section, for a total depth of almost 18,000 ft.

Result

  • The TrackMaster-OH system was successfully deployed, oriented, and set at 17,950 ft MD in accordance with the customer expectations
  • This successful operation saved 98% of the existing lateral open hole section, totaling 8,350 ft.
  • The customer saved an estimated five days of rig time by the avoidance of re-drilling this hole section.

Download the Bulletin for more details

*Mark of Wellbore Integrity Solutions.