TrackMaster* Select System Successfully Deployed, Northern Territory, Australia

TrackMaster* Select System Successfully Deployed, Northern Territory, Australia.

The WIS team in Australia mobilized a TrackMaster Select system at short notice to complete a hard formation sidetrack in a single trip.

Result

  • Rapid mobilization from the WIS support base to the Northern Territory rig location was completed with on-time delivery.
  • The TrackMaster Select was oriented and set, with window milled and rathole drilled in a single trip
  • At surface, the tri-mill was within allowable gauge limits, despite the high compressive strength formation characteristics
  • The subsequent 8 1⁄2 inch directional assembly passed through window without issue, allowing the well to be drilled to TD.

Download the Bulletin for more details

*Mark of Wellbore Integrity Solutions.